First version that ships
MVP development for one job, in weeks
A first version you can put in front of customers — one job, typically 1–2 weeks after kickoff.
An MVP is a first version, not the full roadmap: the screens that teach you something, with structure that can grow. CraveNow, InspectAI, and WaitlistAI are published as 2-week builds. We will cut extra screens that do not prove the idea.
If you already know you are building a longer production app, that is custom app development — Fantasy Cricket Hub is published as 10 weeks, not an MVP timeline. Phone stores are mobile, iOS, or Android. Public sites are web development.
Delivery is remote from the Auckland studio. How we work from Auckland.
What you get
One job on the first screen
We rank what must work on day one. Everything else waits.
A timeline in writing
1–2 weeks is typical for a mobile MVP after kickoff. Your proposal will say the number for your slice.
Structure that can grow
Thin on features, not thin on architecture. Navigation is left ready for the next slice.
Design of the primary loop only
UI/UX on the screens that prove the idea. Settings polish can wait.
MVPs we shipped
Three labelled first versions, each 2 weeks: food ordering, field inspection, and a hospitality wait loop.
MVP · 2 weeks
CraveNow
Find somewhere nearby, filter by cuisine, and see ratings, offers, and how soon food is ready — a food-ordering MVP built around discovery.
MVP · 2 weeks
InspectAI
See today’s inspections, open issues, and start a new job from the dashboard — a field MVP for property teams.
MVP · 2 weeks
WaitlistAI
See occupancy, queue, and wait times while service is live — a hospitality MVP with AI on the average wait.
FAQ
How long does an MVP take, and what does it cost?
Mobile MVPs often ship in 1–2 weeks after kickoff. After a free discovery call you get scope, timeline, and investment for that slice. We do not publish packages.
Will you take this if we already have a long production roadmap?
If v1 is really a full product, we will say so and scope a longer app — not squeeze it into two weeks.
Need a first version in weeks?
Tell us the one job on the first screen. We will say whether a 1–2 week MVP is realistic.
